Image to the young interior designer, a letter (from design to construction) - Designer Lin Ying two ...

 Site measurements of the early design, photography, surveying and mapping work, to be able to skillfully pull tape measure, measuring all the dimensions should be recorded in detail. And to record detailed field plan drawn to scale. On the owners to demand a more timely and complete written records .
complete construction drawings Drawing is the basic work of the present, if a designer did not know the standard construction drawings to complete the detailed construction of Atlas, then at best only be a draftsman or design assistants. (DETAIL) detail drawing , the site must have considerable experience, not speculation crap made out of thin air.
according to the design plans, setting out in the field guide is the first task after the site started, a detailed description of the drawings, plane began lofting, the correct compartment size is the most basic priorities, there is no positioning and sampling, there is no right of plane construction, also mention the quality of the back, so its direct stake in the field recognized and corrected drawings and site access is the first site thing.
so-called avoid construction mistakes. is to ensure the implementation of the design is not to be misunderstood. designed primarily for the quality and quantity for confirmation. and on the materials, construction methods, surface treatment and final results for illustration, the construction side and the design of non-cognitive side gap. and in the construction site to solve the surface to be to explain some of the finishing is not the problem.
than the usual cognitive systems engineering HVAC engineering water and electricity (including air-conditioning engineering, geothermal heating project), Fire Systems Engineering , security systems engineering, information systems engineering (computer network). with these companies engineering staff is learning to communicate on the one hand, on the one hand is to understand the design of the non-independence, the importance of coordination of the project. In addition to the above-mentioned works are mainly hidden systems engineering, and other great associated with the interior design as well as system furniture (office furniture, kitchen cabinets) vendors, pre-makers of wallboard. without adequate communication and understanding, it can not complete the perfect design and engineering.
in site site has come in various types of work, duration of the strict implementation of cross trades with his entry for the call it with the construction of facilities, often rely on designers to arrange coordination. This shows that the architect is considered as a coordinator (COORDINATOR) the role of general, interior designers also played in the engineering of the conveyance system vendor coordinator.
time management on the project to be produced through a strict field time, work cycle, including the progress of each of a smaller time to line represents the number of days, staggered horizontal lines represent the work of the project is the same time. and rigorous implementation of the project may be to remind the designer or ahead of schedule behind the awareness and alertness sufficient, it is an indicator to guide the daily work.
refers to the so-called hidden project can be completed in not on the surface of the pipeline equipment works, such as water, electricity, air conditioning, fire protection, and other projects. of these hidden in the works before the project must be the concern of the larger medium-term bet, because once it was hidden in the pipeline equipment maintenance and troubleshooting is more important and not easy, like nerves and blood vessels of human body meridians, or if the error is affect the safety and normal use, not without special attention.
designers may not want to deal with money, so as not to affect the design process and the outcome, which is absolutely the wrong idea, do not know the cost and budget control of the designer to As engineers do not understand the captain would not be a good captain. designers must understand the price will be the budget, but not necessarily their own to do. Institute of price and budget planning, contribute to the design of the thoughtful and comprehensive, and to complete the design in the budget is absolutely help.
neither detached decorative building materials for all categories above material, but not all off the city environment, or material of all types of materials from one or more of the compound. such as: wooden glass coffee table is the composition of water and wood, the doors are of gold (door hardware) and wood (wood door) of the form.
addition to works from the fight, mud engineering works, water works, wood works, paint works, metal works, doors and windows, stairs have their own projects during the construction of various types of points should be noted that, if not to care, body, request, instructed the builder, pay attention to and enforced, may cause a lot of quality problems, performance issues, sequelae problems or safety issues.
basic understanding of the structure, including mechanics, RC reinforcement, and various structural systems of the instructions. different materials to construct the structure should be noted that different characteristics. which subjects removed the wall? wearing a hole in the position of the beam structure where the slightest effect? RC beams and brick walls, or how the joints? issues such as this are often faced in the design, others such as space truss, tempered glass component system, such as triangular truss more modern structure to the traditional Chinese or Western-style large wooden brackets type, there should be a considerable degree of understanding in order to design methods for the integration of structural design features.
the so-called control of the physical environment is the sense of space provided in the body comfortable environment in the process. including air, light, noise, temperature and other environmental treatment systems. the use of air conditioning and ventilation systems, lighting, lighting system, sound proof, thermal insulation system design, establish the most comfortable environment with people. Meanwhile,bailey UGG boots, energy conservation, demand for environmentally friendly materials is the basic quality of the times.
complete interior design, not lack of the so-called is a choice of activities, furniture and accessories. curtains and fabric in the interior design, if not control, like the completion of seventy percent, absolutely can not get a satisfactory score. Therefore, including paintings,> ornaments, lamps, curtains, bed supplies and other so-called In addition to supporting the professional skills in real terms, more important is the culture, art, aesthetics, and even the history of architecture, art history, conservation repair.
mentioned in the previous chapter in addition to a variety of projects, designers should further behavior of people living, business behavior patterns, cultural characteristics, human psychology and the various professional sectors with a more in-depth knowledge. and have accumulated the implementation experience, the ability of the process of finding answers to the design in order in a short period of time, reasonable high and logical design.
more experienced designers are often familiar with the behavior of various types of indoor space and space needs, including living space, tourism and leisure space, sports and fitness space, space and catering services production, exhibition, health care, education, retail and other public commercial space. accumulated long experience, the establishment of self-operation mode, faced with the challenges of space design.
effect of gathering requirements and space conditions of text data input, for analysis judged to sum up the analysis table format, according to the results into innovative programs, the basis for the amendment, and gradually leads to the model space.
This is a written record of the conditions described by the input to output drawing program operating process. table of contents according to the designer's skill and experience of different ideas, theories and different ability to compete with other for answers, including the length of time the quality of the course. only speed Jie and informative, faster and better, only expression of the designer from the text to numbers, words to graphics, to show the strength of the concept into practice.
- to the young teacher's letter interior designer interior designer required course work content and work according to their interior designers Zhuanshan to classify can be divided into residential and commercial space designers designer House two categories. interior designers work should include talks from business, design, drawings, site supervision, coordination and communication materials to use, budgeting should be fully involved. required course for interior designers. from a single customer's communication needs, to large corporate customers for presentation (PRESENTATION), designers must learn to behave, manners and other skills of eloquence, the actual contents of the report prepared material is basic work. on how to make documenting design requirements for analysis by matrix-style form of statistical analysis, summarized according to the logic design elements, data and quantitative way to replace the text description. quantified results, coupled with space for creativity and Fixed-line theory, the program reasonably practicable, provide the owners confirmation. After the program may be repeated communication with the owners, through the design and supporting information to convince the owners to accept or make amendments to guide owners, and finally confirmed plane program. Li surface design is the designer the beginning of the modeling ideas, through the gradual completion of facade design, color, material and ideas have gradually improved. drawing surface, whether painted or focus on a complete and detailed expression. on the whole design of Atlas, understand exactly what the content of construction drawings, catalog writing, drawing number, index, to be able to categorize various aspects of editing, systematic guidance staff to complete the drawing.. and the way the system works business communication. a variety of manufacturers of construction coordination. the so-called hidden engineering and inspection program is recognized when the plane, elevation and other shapes are also recognized, the materials and colors with the owner's identity through the material sample board to the production of the relevant material in the sample according to the board room with a combination of materials directly sample (such as carpets, mosaic) paste in the plate surface, systematic presentation, to provide the owners try to figure out the performance results. the general properties of materials can be classified according to metal, wood, water, fire,UGG boots cheap, earth, man-made compounds. gold - such as copper, iron, stainless steel, aluminum and other composite materials are of.. of wood - such as plywood, solid wood, imitation wood, plants, paper and so is the.. the water - glass, water, transparent material, such as fountains case of.. the fire - fire, lighting, lighting equipment is the.. earth - ceramic, tile, stone only, pebbles, mosaic genus.. man-made compounds - petroleum products,, generic products, the polymer . on various material properties of the understanding and control, and further to mix properly. In addition to the construction law and may not familiar with the formation of waste materials, poor structural maintenance and other inconvenient though not easily found, but it does bad work. into Order Literacy - familiar patterns and space requirements to meet the needs of a wide range of interior designer's mission.